Hardware compliance

New rules for battery and connected hardware, November 2026 to December 2027

Sixteen US and EU rules that change what a small hardware team selling battery-powered or connected devices has to do in the next fourteen months, each with the date, the requirement, the penalty and the official text. The two that most often mean changing the product itself are the EU user-removable battery rule (18 February 2027) and the FCC ban on Covered List chips and modules in new authorizations (since 13 October 2026).

DateWhereWhat changesPenalty
2026-10-13US FCCNew FCC authorizations are refused for equipment containing chips or modules made by entities on the Covered List; online listings must show the FCC ID (2027-03-01 for sellers holding stock, 2027-06-01 for listings relying on seller declarations)Authorization refused; marketing unauthorized devices is fined under 47 U.S.C. §503source
2026-11-11EUEight product types may use professional-replaceable batteries instead of user-removable (Delegated Regulation 2026/1770)Set by member states (Batteries Regulation Art. 93)source
2026-12-09EUNew Product Liability Directive applies to products placed on the market from this day; software and firmware updates count as products; importers and fulfilment providers can be liableStrict liability for damage, no finessource
2026-12-14 (expected)EUParliament vote on battery rule simplification: Council proposed an 18-month Article 11 delay for newly exempted categories. Not final—source
2026-12-14US MinnesotaPFAS in products report due for companies that received an extension (first deadline was 2026-09-15); $800 fee per manufacturer; ban on intentionally added PFAS from 2032Products not reported may not be sold in Minnesotasource
2027-01-01Air (IATA DGR 68)Sodium-ion batteries added; button cells no longer counted in the "4 cells or 2 batteries" mark exception for batteries in or with equipmentCarrier refuses the shipmentsource
2027-01-01US New MexicoEvery product with intentionally added PFAS must be reported to the state; consumer electronics are not exempt; full ban 2032Up to $15,000 per violationsource
2027-01-20US CPSCCertificates of compliance must be e-filed for regulated products arriving by international mail too (e-filing started 2026-07-08 for other entries)Shipment heldsource
2027-01-20EUMachinery Regulation replaces the Machinery Directive: protection against corruption (cybersecurity) and safety software requirements, including for autonomous robotsSet by member statessource
By 2027-01-31US EPATSCA PFAS reporting window opens for companies that imported PFAS-containing articles, including electronics, since 2011 (a proposal would exempt imported articles; not final)TSCA §16 civil penaltiessource
2027-02-18EUBatteries Regulation Article 11: portable batteries must be removable and replaceable by the user with commercially available tools; e-bike and e-scooter batteries by an independent professionalSet by member states; non-compliant products may not be placed on the marketsource
2027-02-18EUBattery passport for e-bike/e-scooter, EV and industrial batteries over 2 kWh, and a QR code on all batteries (Council proposed delaying the QR code for portable batteries; not final)Set by member statessource
2027-05-09EUSecond stage of standby and networked standby power limits (Regulation 2023/826)Set by member statessource
2027-07-01USDe minimis duty exemption repealed by statute; suspended since 2025-08-29Duty and formal or informal entry on every parcelsource
2027-07-01US CaliforniaFirst annual report from makers of products with embedded batteries (SB 1215): 2026 sales, chemistry, recycled content—source
2027-12-11EUCyber Resilience Act applies in full: security requirements, CE marking, vulnerability handling, support period, SBOM (reporting already applies since 2026-09-11)Up to €15 million or 2.5% of worldwide turnoversource

Already in force and easy to miss

Dates marked expected or not final are proposals. Checked against the official sources on 2026-10-30.

Send us your product

Tell us what the product is, where it is made and sold, and which rule you are stuck on. An engineer replies by email with what has to change, or what data we can get from the factory, and a fixed fee.

Or email chris@anvol.dev. This is an engineering assessment, not a legal opinion or a certification.